Project Overview
Securefence installed 250 metres of 4m high reflective acoustic fencing at a battery energy storage site at Iron Acton, near Bristol, working for high voltage engineering contractor HVGS. The barrier was built from recycled plastic and installed with a full lifting plan because of the height and weight of the components.
The Requirement
A battery energy storage system generates continuous noise whenever it is running. At Iron Acton there were houses within 300 metres of the site, so the noise had to be reduced at the boundary rather than managed after the event.
That required a reflective acoustic barrier of genuine height and mass, specified to perform rather than simply to screen. A 4m barrier of this construction is substantially heavier than standard fencing, which changed the foundation design and the installation method before a single post went in.
The Securefence Solution
Securefence installed 250 metres of 4m reflective acoustic fencing manufactured from recycled plastic, including recycled bottle tops. The material has a service life of 30 to 40 years and is fully recyclable at the end of it, which suited a client and a site where sustainability credentials matter.
The foundations were sized for the loading. Footings on a barrier of this height and mass are considerably larger than standard fence footings, and the concrete pour was planned and executed accordingly.
Installation was carried out under a formal lifting plan with a slinger and a lift supervisor on site. The posts and panels are too heavy to be handled manually at this height, so every lift was planned, supervised and signed off.
Project Challenges
The scale of the foundations was the first challenge. The footings required for a 4m acoustic barrier are large, and the volume of concrete and the pour sequence had to be managed on a live energy site.
The lifting operations were the second. Working at 4m with heavy components meant lift plans, a slinger and a lift supervisor for the post installation, with the sequence controlled so that the plant, the deliveries and the installation team were never competing for the same ground.
The Result
250 metres of 4m reflective acoustic barrier were delivered, reducing noise reaching the nearest houses from a battery storage site that runs continuously. The barrier is built from recycled material, has a 30 to 40 year service life, and is fully recyclable at the end of it.
Project Facts
- Location: Iron Acton, near Bristol
- Client: HVGS
- Sector: Battery energy storage
- Fencing type: Reflective acoustic barrier, recycled plastic
- Height: 4m
- Length installed: 250m
- Service life: 30 to 40 years, fully recyclable